Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 10.03 Mt | 0.30 g/t | 0.10 Moz | 22 Apr 2026 |
| Inferred | 26.74 Mt | 0.25 g/t | 0.22 Moz | 22 Apr 2026 |
| Total Resources | 36.77 Mt | 0.26 g/t | 0.32 Moz | 22 Apr 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 10.03 Mt | 4.73 g/t | 1.53 Moz | 22 Apr 2026 |
| Inferred | 27.76 Mt | 7.19 g/t | 6.42 Moz | 22 Apr 2026 |
| Total Resources | 37.79 Mt | 6.54 g/t | 7.94 Moz | 22 Apr 2026 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 10.03 Mt | 0.39% | 0.04 Mt Cu | 22 Apr 2026 |
| Inferred | 18.17 Mt | 1.08% | 0.20 Mt Cu | 22 Apr 2026 |
| Total Resources | 28.20 Mt | 0.83% | 0.23 Mt Cu | 22 Apr 2026 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 10.03 Mt | 0.83% | 0.08 Mt Zn | 22 Apr 2026 |
| Inferred | 18.17 Mt | 1.00% | 0.18 Mt Zn | 22 Apr 2026 |
| Total Resources | 28.20 Mt | 0.94% | 0.26 Mt Zn | 22 Apr 2026 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Ag | Cu | Zn | As at | Source | Provenance | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | Grade (% Zn) | Contained (Mt Zn) | ||||||
| Total | Total Resources | 28.20–37.79 Mt | |||||||||||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| 0.26 g/t | 0.32 Moz |
| 6.54 g/t | 7.94 Moz |
| 0.83% | 0.23 Mt Cu |
| 0.94% | 0.26 Mt Zn |
| 22 Apr 2026 |
| — |
| Bob Open Pit | Indicated | 3.23 Mt | 0.27 g/t | 0.03 Moz | 3.90 g/t | 0.41 Moz | 0.34% | 0.01 Mt Cu | 0.33% | 0.01 Mt Zn | 22 Apr 2026 | Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)
QA notes:
|
| Bob Open Pit | Inferred | 5.82 Mt | 0.28 g/t | 0.05 Moz | 6.00 g/t | 1.12 Moz | 0.97% | 0.06 Mt Cu | 0.80% | 0.05 Mt Zn | 22 Apr 2026 | Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)
QA notes:
|
| Bob Underground | Indicated | 0.99 Mt | 0.40 g/t | 0.01 Moz | 5.00 g/t | 0.16 Moz | 0.34% | 3.37 kt Cu | 0.64% | 0.01 Mt Zn | 22 Apr 2026 | Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)
QA notes:
|
| Bob Underground | Inferred | 4.19 Mt | 0.30 g/t | 0.04 Moz | 7.30 g/t | 0.98 Moz | 1.04% | 0.04 Mt Cu | 0.96% | 0.04 Mt Zn | 22 Apr 2026 | Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)
QA notes:
|
| Cold Lake Open Pit | Indicated | 0.65 Mt | 0.32 g/t | 0.01 Moz | 7.00 g/t | 0.15 Moz | 0.35% | 2.28 kt Cu | 0.66% | 4.3 kt Zn | 22 Apr 2026 | Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)
QA notes:
|
| Cold Lake Open Pit | Inferred | 0.42 Mt | 0.34 g/t | 4.59 koz | 21.00 g/t | 0.28 Moz | 1.42% | 0.01 Mt Cu | 2.08% | 0.01 Mt Zn | 22 Apr 2026 | Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)
QA notes:
|
| Cold Lake Underground | Indicated | 0.31 Mt | 0.46 g/t | 4.58 koz | 7.00 g/t | 0.07 Moz | 0.32% | 1 kt Cu | 0.58% | 1.8 kt Zn | 22 Apr 2026 | Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)Unverified | notes (5)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)
QA notes:
|
| Jungle Open Pit | Indicated | 2.31 Mt | 0.08 g/t | 0.01 Moz | 2.80 g/t | 0.21 Moz | 0.33% | 0.01 Mt Cu | 0.30% | 0.01 Mt Zn | 22 Apr 2026 | Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)
QA notes:
|
| Jungle Open Pit | Inferred | 2.88 Mt | 0.28 g/t | 0.03 Moz | 6.80 g/t | 0.63 Moz | 1.23% | 0.04 Mt Cu | 0.78% | 0.02 Mt Zn | 22 Apr 2026 | Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)
QA notes:
|
| Jungle Underground | Indicated | 0.65 Mt | 0.09 g/t | 1.88 koz | 2.50 g/t | 0.05 Moz | 0.33% | 2.15 kt Cu | 1.58% | 0.01 Mt Zn | 22 Apr 2026 | Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)
QA notes:
|
| Jungle Underground | Inferred | 4.38 Mt | 0.16 g/t | 0.02 Moz | 5.40 g/t | 0.76 Moz | 1.08% | 0.05 Mt Cu | 1.08% | 0.05 Mt Zn | 22 Apr 2026 | Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)
QA notes:
|
| Lost Lake Open Pit | Indicated | 1.89 Mt | 0.59 g/t | 0.04 Moz | 8.00 g/t | 0.49 Moz | 0.61% | 0.01 Mt Cu | 2.25% | 0.04 Mt Zn | 22 Apr 2026 | Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)Unverified | notes (4)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1a: Sherridon Project Mineral Resource Estimate (Indicated)
QA notes:
|
| Lost Lake Open Pit | Inferred | 0.48 Mt | 0.76 g/t | 0.01 Moz | 17.00 g/t | 0.26 Moz | 1.38% | 0.01 Mt Cu | 3.31% | 0.02 Mt Zn | 22 Apr 2026 | Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)Unverified | notes (5)Source: T2 Metals Files NI 43-101 Mineral Resource Estimate Report for the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 26 June 2026 Ref: Table 1b: Sherridon Project Mineral Resource Estimate (Inferred)
QA notes:
|
| Open Pit | Inferred | 9.59 Mt | — | — | 7.70 g/t | 2.37 Moz | — | — | — | — | 22 Apr 2026 | Table 1b: Sherridon Project Mineral Resource Estimate (Inferred) — Total Inferred OP rowUnverified | notes (4)Source: T2 Metals Announces NI 43-101 Mineral Resource Estimate at the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 07 May 2026 Ref: Table 1b: Sherridon Project Mineral Resource Estimate (Inferred) — Total Inferred OP row
QA notes:
|
| Underground | Inferred | 8.57 Mt | 0.20 g/t | 0.06 Moz | — | — | — | — | — | — | 22 Apr 2026 | Table 1b: Sherridon Project Mineral Resource Estimate (Inferred) — Total Inferred UG rowUnverified | notes (16)Source: T2 Metals Announces NI 43-101 Mineral Resource Estimate at the Sherridon Copper-Zinc-Gold-Silver Project, Manitoba, Canada · published 07 May 2026 Ref: Table 1b: Sherridon Project Mineral Resource Estimate (Inferred) — Total Inferred UG row
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.