Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 12.85 Mt | 0.89 g/t | 0.37 Moz | 06 Apr 2026 |
| Indicated | 32.56 Mt | 0.70 g/t | 0.74 Moz | 06 Apr 2026 |
| Inferred | 11.20 Mt | 0.53 g/t | 0.19 Moz | 06 Apr 2026 |
| Total Resources | 56.61 Mt | 0.71 g/t | 1.29 Moz | 06 Apr 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 12.85 Mt | 6.50 g/t | 2.70 Moz | 06 Apr 2026 |
| Indicated | 32.56 Mt | 9.20 g/t | 9.66 Moz | 06 Apr 2026 |
| Inferred | 11.20 Mt | 11.20 g/t | 4.02 Moz | 06 Apr 2026 |
| Total Resources | 56.61 Mt | 8.98 g/t | 16.39 Moz | 06 Apr 2026 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | Ag | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | |||||
| Measured | 12.85 Mt | 0.89 g/t | 0.37 Moz | 6.50 g/t | 2.70 Moz | 06 Apr 2026 | Table 1: Esperanza Pit-Constrained Mineral Resource Estimate SummaryUnverified | |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (3)Source: Zacatecas Silver Announces 21% Increase in High-Grade Heap-Leach Updated Gold Mineral Resource at the Esperanza Gold Project to 1.15 Moz AuEq from 45.4 Mt at 0.79 g/t - Grades Above Global Heap-Leach Average & Highest Grades at Surface · published 22 June 2026 Ref: Table 1: Esperanza Pit-Constrained Mineral Resource Estimate Summary
|
| Indicated | 32.56 Mt | 0.70 g/t | 0.74 Moz | 9.20 g/t | 9.66 Moz | 06 Apr 2026 | Table 1: Esperanza Pit-Constrained Mineral Resource Estimate SummaryUnverified | notes (3)Source: Zacatecas Silver Announces 21% Increase in High-Grade Heap-Leach Updated Gold Mineral Resource at the Esperanza Gold Project to 1.15 Moz AuEq from 45.4 Mt at 0.79 g/t - Grades Above Global Heap-Leach Average & Highest Grades at Surface · published 22 June 2026 Ref: Table 1: Esperanza Pit-Constrained Mineral Resource Estimate Summary
|
| Inferred | 11.20 Mt | 0.53 g/t | 0.19 Moz | 11.20 g/t | 4.02 Moz | 06 Apr 2026 | Table 1: Esperanza Pit-Constrained Mineral Resource Estimate SummaryUnverified | notes (3)Source: Zacatecas Silver Announces 21% Increase in High-Grade Heap-Leach Updated Gold Mineral Resource at the Esperanza Gold Project to 1.15 Moz AuEq from 45.4 Mt at 0.79 g/t - Grades Above Global Heap-Leach Average & Highest Grades at Surface · published 22 June 2026 Ref: Table 1: Esperanza Pit-Constrained Mineral Resource Estimate Summary
|
| Total Resources | 56.61 Mt | 0.71 g/t | 1.29 Moz | 8.98 g/t | 16.39 Moz | 06 Apr 2026 | derived from 3 rows | — |